Skip to content
Homepage " Products Certification " NC RfG

NC RfG

Network code - requirements for grid connection of generators

From May 1, 2022, it is mandatory to use a certificate confirming the fulfillment of:

  1. COMMISSION REGULATION (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators (O.J. UE L 112/1 of 27.4.2016)
  2. General Application Requirements resulting from EU Commission Regulation 2016/631 of 14 April 2016 establishing a network code on requirements for the connection of generation units to the network – approved by the Decision of the President of the Energy Regulatory Office.

Based on the AC197 accreditation granted by PCA, ICR Polska is a certification body competent to assess generation units in accordance with the above-mentioned requirements.

Our Certificates are issued on the basis of a certification programme compliant with the PTPiREE document „Conditions and procedures for the use of certificates in the process of connecting energy generation modules to power grids” – Version 1.3 of 1 October 2024.

We invite manufacturers and importers of power generation modules to use our services so that the products offered can be connected to power grids in the EU.

Please contact ICR Polska

Do it to be at least one step ahead of the competition.

Program of NC RfG equipment assessment (EU) 2016/631

Application for NC RfG equipment assessment (Regulation EU) 2016/631)